The Brief
Hawker Construction were asked to provide a full ground works package and act as Principle Contractor for the duration of the project.
- Site set up & welfare.
- Site management.
- Foundations
- Foul & surface water drainage
- Water and electrical services.
- Paths, skirt & fencing
The Solution
Following a phase 1 and 2 ground investigation the design scheme was developed and a plan in place.
The site was set up with fencing, welfare and all appropriate signage. Our site manager was briefed and the in very difficult weather conditions the foundations were prepared on time and ready for the module delivery.
Once installed the landscaping was completed and the site handed back to the school.
TESTIMONIAL
A massive thank you for all your help and support with this project
Sarah Mayes, Business Manager