The Crest

New Two-Bedroom Bungalow

The client appointed Hawker Construction to deliver a new build, two-bedroom. three bathroom bungalow incorporating a double garage, workshop, living room, kitchen / diner, utility room and plant room. The property benefits from an energy-efficient heating system using air source heat pumps, with electricity supplemented by a solar PV array installed on the south-facing roof.

The primary challenge was the demanding programme with all the groundworks and foundations required to reach damp-proof course level before the end of the newt breeding season due to the protected species in the area. Following commencement of the foundation works it became apparent that the ground investigation information provided was inaccurate, meaning a piled foundation solution was required. This presented a significant challenge given the limited timeframe and the usual lead-in times with this type of work.

Hawker Construction arranged a revised ground investigation and worked closely with our supply chain to secure and mobilise a piling rig at short notice. The piling works were completed, allowing the reinforced concrete ring beam to be constructed and the foundations brought up to DPC level within the required time. Throughout the works, careful consideration was given to environmental protection, minimising any risk of harm to the newt population.

Despite the challenges Hawker Construction successfully delivered the critical foundation works through effective supply chain management and careful programme coordination.

Find out more today